Skip to main content

Most of a system's cost and operating quality is decided on the drawing board. Megatrend joins at concept stage so the ICT and ELV systems meet the operator's standards first time, avoiding costly changes once construction has started.

Two engineers reviewing a system floor plan at a table

Consulting directions

  • Hotel and resort ICT

    Designed to international brand standards: network, Wi-Fi, HSIA, IPTV, PBX, audio-visual and the supporting infrastructure.

  • The complete ELV package

    Turnkey consultancy for every extra-low-voltage system in the building, coordinated with the architecture and MEP teams.

Scope of work

  • Concept design

    System list, architecture options, budget direction and the main space requirements.

  • Schematic design

    Topology diagrams, MDF and IDF room layouts, capacity sizing and coordination with other disciplines.

  • Construction design

    Detailed drawings, equipment schedules, specifications, bills of quantities and tender documents.

  • Design-intent supervision

    Answering contractor queries and reviewing submittals so the design is built as intended.

  • Empty control room with crated equipment waiting to be installed
  • Bundles of signal cable dropping from ceiling trays into a technical room
  • Open server cabinet in an equipment room

How we work

  1. Understand

    Review the brand standards, the owner's requirements and the architectural drawings.

  2. Design

    Develop the system architecture and drawings stage by stage.

  3. Verify

    Check against the operator's standards and resolve deviations before tender.

  4. Support

    Assist through tender and construction so the design stays intact.

Other services

Planning a project?

Tell us about your site and requirements. Our team will get back to you.

Contact us